Paths/Copilot Engineer/Team Adoption / Measuring Adoption
Roll It Out in Phases
A tool that helps one team can ruin another. Write the phased rollout with the exit criteria for each phase.
Validator
⏱ 0:00
IDLE — checks run live as you type commands; submit when done
01Requirements
live checks- File ~/adoption/rollout.md exists○
- The plan has a pilot, a team and an organisation phase○
- The plan states the exit criteria for every phase○
02Walkthrough
1 of 4 revealed- 01
Create the adoption directory
The rollout plan lives with the guidelines it implements.
mkdir -p ~/adoption - 3 locked · each failed submit reveals one
03Stuck?
0 of 3 revealedTake a hint without losing the lab — each one points at the thing to look at, not at the answer.
04AI Tutor
guides, never solvesTell me what you're stuck on — I'll nudge, not solve. Which requirement are you looking at?
04Notebook
saved locally in this browserlearner@lab — ubuntu:24.04
Session is disposable
↑/↓ recalls commands · Ctrl+Enter submits · type help for the command list